Two new Project Level Reports are now available for your use:
1) Guy Utilizations. This report shows all guys used in your project with their utilization results compiled into a very condensed report, sorted by Street, Structure Name/Number. This becomes a companion Detail report to the "Project Analysis Summary" report which shows a one-liner of results for the worst case at each structure.
2) Anchor Utilizations. Very similar to the Guy Utilizations report, this report shows all anchors used in the project in a very condensed manner, also sorted by Street and connected or nearby Structure Name/Number.
Both reports can be used for documentation and/or quality control purposes.