Objectives
The objectives of this framework is to assess:
- National Code compliance
- This objective is the largest with a few different dimensions.
- Weather Loads calculation
- Sags & Tensions
- Structural analysis
- Single pole structure
- Linear,
- Nonlinear,
- Geometric and Load Non-linearity
- Multiple single pole structures
- Geometric and Load Non-linearity
- Clause by clause review
- Utility standard compliance/support
- This objective is about support for particular pole owner or utility standards. For instance, it is quite common for a utility to require higher standards than those found in the national code (e.g highway clearances)
- Interoperability with other software
- This objective is important for users to know, as the Line Design software is an important piece of the user's overall Line Design Process.